本script為載入jquery核心使用,不影響頁面資訊瀏覽
:::* 瀏覽位置:首頁 > 關於公司
  • 字級選擇
  • 大
  • 中
  • 小

關於公司


【發 展 歷 程】

  • 照片說明文字

     

     

     *1980年08月

    開始量產,主要設備為800T級鋁擠型生產線,初期以提供鋁門窗料為主。
    JE Extrusion Co Ltd was established in August of 1980. During the year the primary production equipment was a 4” 800 tone extrusion press.

     *1984年 設立合金(熔爐)部門,自行生產鋁擠型所需原料(鋁擠錠)。
    In 1984 the furnace department was formed, achieving the ability to manufacture ingots and billet.
     *1988年 第一次轉型,裁撤合金(熔爐)部門,委由專業廠商供應。而公司則致力於工業用精密擠型的技術研發。
    In 1988 the furnace department was closed the ingot and billet production outsourced, and the company identified the market needs of “high-precision aluminum extrusion”. During this year the company dedicated it self to supplying “high-precision aluminum products” and gained vast experience in extruding automobile, computing and Industrial equipment.
     *1990年 擴建廠區,並於同年8月安裝第二條生產設備(含1250T級擠型機、鋁錠預熱爐、模具預熱爐、鋁錠裁切機、更新T5處理爐)。
    By 1990 JE extrusion’s business had grown rapidly, the factory space was extended, and production line 2 was introduced in August. Production line 2 includes a 1.250-ton aluminum extrusion press, an aluminum ingot preheating furnace a mould preheating furnace, an aluminum ingot-cutting machine and an updated T5 aluminum heat treatment machine.
     *1992年 更新第一條生產設備(含擠型機、鋁錠預熱爐、模具預熱爐),並由原先800T級擠型機更換為600T級擠型機。
    In 1992 production line one’s equipment received an upgrade, including new aluminum extrusion press, an aluminum ingot preheating furnace and a mould preheating furnace, replacing the existing 800-tone press with a 600-ton extrusion press to better meet the markets needs and to provide customers with more efficient delivery times as well as to create competitive prices.
     *1997年 大幅翻修廠房,改善工作環境,以提高員工作業的舒適性。
    In 1997, the factory went through remodeling, improving the environment and giving staff members better ambience and a more comfortable work place in which to work and improving manufacturing efficiency and output.
     *2000年01月

    第二次轉型:購置鋁線生產設備(捲線機、伸線機),開始進入鋁盤元市場。
    In January of 2000 JE Extrusion went through a secondary production capability upgrade: Purchasing production line equipment (winding machine threading machine) to enter the market of aluminum plate production.

     *2003年07月 購置「連續式T4爐」設備,以提供客戶大量且品質穩定的鋁料後處理(T6)作業。
    In July of 2003 a purchase of continuous T4 furnace was purchased to provide for customers who needed large quantities of production, while maintaining a very stable aluminum material, and top quality products were achieved during the“T6” production process.
     *2003年10月 購置面積約770坪的一號倉庫。
    In October of 2003 a 2,500 square meter warehouse named warehouse 1 was purchased
     *2004年03月 購置「拉力試驗機」設備一套,透過材料的拉力測試與分析,可以提供客戶品質優良且可信任的高強度鋁合金材料。
    In March of 2004 the company purchased a tensile strength testing machine allowing the testing of material and providing analysis to provide customer with high quality and trust worthy aluminum extrusion product.
     *2004年08月 成立二廠,同時建構面積約432坪的全新廠房。
    In August of 2004, production facility 2 was acquired and established. A new manufacturing area of 1500 square meter was built.
     *2005年01月 成立第三條600T級鋁擠型生產線,同時更新第一條生產線為「800T級直接複動式擠型機」,正式進入「無縫管」市場。
    In January of 2005 the company established production line 3 which had a 600-ton extrusion press; the company also upgraded the production line to 800 tons 「800 tons class direct reciprocating extruder」,penetrating the seamless tube market。
     *2010年06月 更新第二條生產線為「1800T級直接複動式擠型機」,以提供更完整規格的「無縫管」,正式完成第三次轉型。
    In June of 2010 production line 2 was upgraded to1800 tons extrusion press this 1800 tons extrusion press completes product line. This completed stage 3 of the business direction.
     *2010年01月 購置面積約150坪的二號倉庫。
    In October 2010 the acquisition of 500 square meter factory called warehouse 2 was made.
     *2011年04月

    購置面積約300坪的三號倉庫。
    In April of 2011 the acquisition of a 1000 square meter factory called warehouse 3 was made.

     *2013年03月

    購置面積約806坪的第三工作區。
     *2016年06月 原一號倉庫取得政府單位核准,正式設立第三工廠。
*回上一頁 *到最上面